Here is the synopsis of our sample research paper on Designing a Computer Information System. Have the paper e-mailed to you 24/7/365.
Essay / Research Paper Abstract
7 pages. This paper describes the requirements of a new computer information system, the components necessary in the final system, and how these components will work together. Other considerations include the cost of the system and other needs such as training, security, and maintenance. Final recommendations are given as to the viability of this project. This paper can be used to work for any example company. Bibliography lists 3 sources.
Page Count:
7 pages (~225 words per page)
File: D0_JGArecis.rtf
Buy This Term Paper »
 
Unformatted sample text from the term paper:
the components necessary in the final system, and how these components will work together. Other considerations include the cost of the system and other needs such as training, security,
and maintenance. Final recommendations are given as to the viability of this project. REQUIREMENTS OF THE SYSTEM The system being created for Virtual Realty will include input and
output specifications. The input specification screen will have data entry points for each of the information segments needed for each database. In the customer database this will include
the last name, first name and middle initial. The first line of the input file will contain three integers. These are the length of the name the placement of the
name and the places the name will be input. The dimension of the data report can range from 2 to 10, and the height and width of each data can
range from 1 to 25. For example, the input ``5 5 7 (without the quotes, of course) specifies a name that is 5 - 5 spaces in size, with individual
spaces that are 5 - 7 characters in size. All information slots will have the same height and width. The rest of the file specifies the rest of the information
in arbitrary order. Each piece of information is specified by that information followed by a line containing four integers ranging from -5 to +5. These values indicate the places each
pertinent piece of information should go. COMPONENTS NECESSARY PERT/CPM which stands for Project Evaluation and Review Technique and Critical Path Method is a critical piece of information
showing the interrelationships between tasks. In some cases, these interrelationships are not particularly important or are so few in numbers that they can easily be handled. However, in more complicated
...